Serving clients across Kenya info@ultracarehygiene.co.ke +254 797 782 780

Pre-Construction Termite Treatment

Soil treatment before slabs are cast, so new buildings start protected.

Termite protection built in from day one

Ultracare offers pre-construction termite treatment in Nairobi for homes, apartment blocks, schools, warehouses, factories and commercial developments. Before the foundation slab is cast, we treat the soil in trenches and under the floor area, so termites meet a protective barrier between the ground and the building. It is far easier to protect a structure at this stage than to treat beneath a finished floor later, and it gives owners peace of mind from the moment they move in.

We work with developers, contractors, architects and individual home builders, and provide pre-construction termite treatment in Kenya beyond the capital, including pre-construction termite treatment in Mombasa and other coastal towns.

Why new buildings in Kenya need it

Much of Kenya's building land sits on soil where termites are already active. Mounds are common across the country, and the underground colonies that build them spread well beyond what is visible. When land is cleared for construction, termites lose the roots and plant matter they were feeding on and often turn to the new building instead.

Termites can travel through tiny cracks in concrete, along service pipes and through expansion joints to reach timber roof trusses, door frames, kitchen cabinets, wooden floors and stored goods. Damage usually stays hidden until it is serious. In the warm, damp conditions around the rainy seasons, and in humid places such as Mombasa and Kisumu, colonies grow and spread quickly.

With construction happening across Nairobi's growing estates and satellite towns, from Kitengela and Syokimau to Ruiru and Kiambu, building in protection at the foundation stage is a sensible part of any project.

When to book

The right time depends on your construction schedule. Contact us:

  • As soon as you have a site and a programme, so treatment can be planned into the schedule
  • Before foundation trenches are backfilled
  • After the ground is levelled and compacted, but before the damp-proof membrane and slab are laid
  • Before extensions, boundary walls or outbuildings are built on existing plots
  • When clearing land that has visible termite mounds or a history of termite activity

If the slab is already cast, it is still possible to protect the building, using the methods on our termite control page.

How Ultracare carries out the treatment

1. Site survey. We visit the site, look at the soil, existing mounds and drainage, and review the foundation layout with your contractor or site manager. Where mounds are present, we plan how to deal with them before construction continues.

2. Plan, schedule and clear quote. We prepare a written plan that matches your construction stages, with a clear quote based on the size of the footprint and the trenches to be treated.

3. Treatment of foundations and trenches. Our technicians apply treatment to the base and sides of foundation trenches, around column bases and to the soil within the floor area before the slab is cast. Particular attention is paid to points where pipes and services pass through, as these are common entry routes. All products are handled only by trained, licensed technicians using protective equipment.

4. Works with your construction schedule. We coordinate with the site team so treatment happens at the right moment, without holding up excavation, plumbing or concreting. Where a building is constructed in phases, we return for each phase as it reaches the right stage.

5. Treatment certificate on completion. Once the work is done, you receive a written record of the treatment, including the areas treated and the dates, for your project file and for the future owner or buyer.

6. Long-lasting barrier. When the soil barrier is applied correctly and left undisturbed, it continues to protect the building from below. We advise on how to keep it intact during later works.

Preparing the site

To get the most from the treatment, the site team should:

  • Complete excavation, levelling and compaction before we arrive
  • Remove timber offcuts, tree roots, formwork and other cellulose debris from trenches and the floor area
  • Make sure trenches are reasonably dry and not waterlogged
  • Agree a time when other trades can stay clear of the area during and immediately after treatment
  • Avoid disturbing treated soil before the damp-proof membrane and slab are laid

We brief your site manager on the safety steps, including keeping workers and the public away from freshly treated ground until we confirm it is safe.

Keeping the protection working

A barrier works only if it stays complete. After the building is finished:

  • Do not dig into treated ground near foundations without telling us first
  • Keep garden beds, soil and mulch from building up against walls above floor level
  • Make sure gutters and drainage carry water away from the foundation
  • Keep timber, firewood and cardboard stored away from the building
  • Book a periodic inspection, especially around the long and short rains
  • If an extension is planned, treat its foundation too so the protection stays continuous

Once your building is complete, post-construction cleaning can remove dust and debris so the property is ready to hand over.

Projects we work on

We treat sites for private home builders, residential estates and housing developments, schools, churches, hotels, offices, and manufacturing and industrial buildings, as well as warehouses and farm structures.

Where we work

We carry out pre-construction termite treatment in Nairobi on building sites across the city and the surrounding counties, and we also work in Mombasa, Kisumu, Nakuru, Eldoret and other towns across Kenya.

Book a free survey early in your project and we will plan the treatment around your construction schedule.

What's included

  • Treatment of foundations and trenches
  • Works with your construction schedule
  • Treatment certificate on completion
  • Long-lasting barrier

Related guides

Frequently asked questions

At what stage of construction should the treatment be done?

The main treatment is done after excavation, levelling and compaction, and before the damp-proof membrane and slab are laid. Foundation trenches and column bases are treated before backfilling. Contact us when you have a programme, so we can plan visits for each stage and avoid any delay to the concreting.

Will the treatment delay my construction work?

It should not. We coordinate with your contractor or site manager and schedule visits at the right moment in the programme. Treatment of a typical trench or floor area is planned to fit between excavation and concreting, and we return for each phase on larger or phased projects so other trades can keep working.

What do I receive when the treatment is finished?

You receive a written treatment certificate for your project file. It records the areas treated, the stages covered and the dates of each visit. Developers often share it with buyers, and homeowners keep it with the building plans, so future owners know the foundation was treated before construction.

Can you treat a building where the slab is already cast?

Yes, but the method changes. For existing slabs, we usually treat the soil around the building and may drill small holes through the floor along walls to reach the soil beneath, sealing them afterwards. It is more involved than pre-construction treatment, which is why booking before the slab is cast is easier.

What should I do about termite mounds on my plot?

Tell us at the survey. Mounds on or near the building footprint are dealt with before construction continues, as the colony can extend well beyond the visible mound. We plan the mound treatment together with the trench and soil treatment, so the whole site is prepared before the slab goes down.

Book a free survey

Monday to Saturday. We will call you to confirm the exact time.

We reply within working hours. Prefer WhatsApp? Chat with us.